Bedminster Green river restoration and transport consultation feedback

We asked

Public consultation on the proposed transport improvements and river restoration works was undertaken between the 21 January 2021 and the 4 March 2021, a period of six weeks.

This sought to build on the feedback generated through an early consultation in February 2020 to improve travel through and within the area. The consultation asked for public feedback on the preliminary designs for transport improvements and river restoration works in Bedminster Green.

You said

Transport Improvements:

388 people respondend to this consultation, the results of which are available in the Bedminster Green Transport consultation report.

River Restoration:

388 people responded to this consultation online, the results of which are available in the Bedminster Green River Restoration Consultation Report.

We did

Transport Improvements:

The Bedminster Green Transport - You Said, We Did document shows how Bristol City Council is using the community feedback from the Bedminster Green Transport consultation to inform designs going forward.

River Restoration:

The Bedminster Green River Restoration You Said, We Did document shows how Bristol City Council is using the community feedback from the Bedminster Green Transport consultation to inform designs going forward.’

Share Bedminster Green river restoration and transport consultation feedback on Facebook Share Bedminster Green river restoration and transport consultation feedback on Twitter Share Bedminster Green river restoration and transport consultation feedback on Linkedin Email Bedminster Green river restoration and transport consultation feedback link

Consultation has concluded

<span class="translation_missing" title="translation missing: en.projects.blog_posts.show.load_comment_text">Load Comment Text</span>